Journal of Radiology Nursing
Volume 25, Issue 3 , Page 93, September 2006

Safe PICC Line Ordering and Activation

Northwestern Memorial Hospital, Chicago, IL

The purpose of this project was to define an ordering process to assure an error proof approach in the prevention of premature PICC line activations.

A three-part ordering process was instituted to delineate the steps from PICC line placement to verification and use. A visual cue including a stockinet and stop sign sticker placed at the catheter tip was selected to prompt staff to confirm a physician order before activation.

Before program implementation there were four reported premature activations whereas postimplementation yielded zero premature line activations. This study concluded successful intervention regarding ordering and activation management.

No full text is available. To read the body of this article, please view the PDF online.

To access this article, please choose from the options below

Login to an existing account or Register a new account.

  • Purchase this article for 12.00 USD (You must login/register to purchase this article)

    Online access for 24 hours. The PDF version can be downloaded as your permanent record.

  • Subscribe to this title

    Get unlimited online access to this article and all other articles in this title 24/7 for one year.

  • Claim access now

    For current subscribers with Society Membership or Account Number.

  • Visit SciVerse ScienceDirect to see if you have access via your institution.
 

PII: S1546-0843(06)00088-5

doi:10.1016/j.jradnu.2006.07.007

Journal of Radiology Nursing
Volume 25, Issue 3 , Page 93, September 2006